Project: Moo Print
Sector: Industrial
Contract Duration: 10 Weeks
Description
Tarnwalk completed the full electrical design and installation of the industrial warehouse with a mezzanine office and breakout area. The warehouse area required large electrical loadings to run the manufacturing equipment on a day to day basis, Tarnwalk created a concept of basket drops and high level containment to house the essential distribution boards and cable.